Friday, December 31, 2010

Tiling

Tiling and grouting completed (clean up still to be done).  Feature tiling on top of hob in family bathroom is not straight so will ask them to fix before the bath goes in.


Family bathroom






Powder room


Laundry

Ensuite bathroom


Family bathroom

Ensuite bathroom

Monday, December 13, 2010

Painting

Painting has been completed.  Front door, back sliding doors and edge of stairs have been stained.  Love the colour.  Heating/cooling and return air vents have been installed and control for heating/cooling.  Glass splashback has been installed in kitchen.  Shelving has been installed in pantry, linen and wardrobes.  Tiles are on site which are to be installed by 17 December.  We are nearly there!


Front door now with stain

Tiles on site

Back sliding doors with stain

Glass splashback

Pantry shelving

Bedroom sliding door with stain (timber panel outside door on balcony should be glass - to be rectified)

Upstairs linen

Stairs with stain - carpet to be installed after handover

Heating/cooling vents downstairs

Door into main bedroom.  Very happy with paint colour.

Tiles for laundry and bathrooms