Friday, December 31, 2010

Tiling

Tiling and grouting completed (clean up still to be done).  Feature tiling on top of hob in family bathroom is not straight so will ask them to fix before the bath goes in.


Family bathroom






Powder room


Laundry

Ensuite bathroom


Family bathroom

Ensuite bathroom

Monday, December 13, 2010

Painting

Painting has been completed.  Front door, back sliding doors and edge of stairs have been stained.  Love the colour.  Heating/cooling and return air vents have been installed and control for heating/cooling.  Glass splashback has been installed in kitchen.  Shelving has been installed in pantry, linen and wardrobes.  Tiles are on site which are to be installed by 17 December.  We are nearly there!


Front door now with stain

Tiles on site

Back sliding doors with stain

Glass splashback

Pantry shelving

Bedroom sliding door with stain (timber panel outside door on balcony should be glass - to be rectified)

Upstairs linen

Stairs with stain - carpet to be installed after handover

Heating/cooling vents downstairs

Door into main bedroom.  Very happy with paint colour.

Tiles for laundry and bathrooms

Sunday, October 31, 2010

Quick update

Stone benchtops have been installed.  Painters are supposed to be onsite second week of November.  Won't be ready for Christmas which is disappointing - not expecting handover until mid-February.  Has been a long road seeing as though we paid our deposit before Christmas last year.

Saturday, October 23, 2010

Cupboards...

Over the last few weeks, stairs, cupboards to all bathrooms, kitchen and laundry and all doors - internal and external -  have been installed. The front sections of the house have been rendered, but are not yet painted. Eaves and external cladding have been painted also.








Tuesday, September 28, 2010

Plastering

Walls and ceilings plastered. Roof completed over garage and pantry.  Hopefully we'll have some stairs soon.  Starting to look and feel like our home!

Alfresco

Bathroom

Dining Room

Family room

Front door / Living Room on left

Garage (From interior door)

Kitchen

Laundry

Living room

Main bedroom

Sliding door out to balcony in main bedroom

Spare bedroom

Stairwell / understair storage

Study

Bedroom 2

Top of stairs

Upstairs TV room

View from front door

Sunday, September 12, 2010

Brickwork and insulation.

Brickies were back on site this week to install an extra row of bricks. Garage roof trusses installed and garage spouting. Fascia installed. Insulation installed. Rough in almost completed for hydronic heating. Plaster has been delivered to site and install later in the week.



Garage
.
Plaster on site
Insulation
airconditioning unit
Back family room. Top left window is spare bedroom. Top right window is bathroom.  Far right Tim's room.

Front living room (will be rendered)