Sunday, September 12, 2010

Brickwork and insulation.

Brickies were back on site this week to install an extra row of bricks. Garage roof trusses installed and garage spouting. Fascia installed. Insulation installed. Rough in almost completed for hydronic heating. Plaster has been delivered to site and install later in the week.



Garage
.
Plaster on site
Insulation
airconditioning unit
Back family room. Top left window is spare bedroom. Top right window is bathroom.  Far right Tim's room.

Front living room (will be rendered)