Tuesday, September 28, 2010

Plastering

Walls and ceilings plastered. Roof completed over garage and pantry.  Hopefully we'll have some stairs soon.  Starting to look and feel like our home!

Alfresco

Bathroom

Dining Room

Family room

Front door / Living Room on left

Garage (From interior door)

Kitchen

Laundry

Living room

Main bedroom

Sliding door out to balcony in main bedroom

Spare bedroom

Stairwell / understair storage

Study

Bedroom 2

Top of stairs

Upstairs TV room

View from front door

Sunday, September 12, 2010

Brickwork and insulation.

Brickies were back on site this week to install an extra row of bricks. Garage roof trusses installed and garage spouting. Fascia installed. Insulation installed. Rough in almost completed for hydronic heating. Plaster has been delivered to site and install later in the week.



Garage
.
Plaster on site
Insulation
airconditioning unit
Back family room. Top left window is spare bedroom. Top right window is bathroom.  Far right Tim's room.

Front living room (will be rendered)